The main purpose of the fuses and breakers are to protect the wiring.
Backfeed breaker solar.
The problem is the backfeeding only happens when battery is fully charged.
The nec allows adding a back feed breaker so that the current supply is up to 120 of the rating of the bus bar.
Article 690 requirements apply to solar pv systems.
From there you d land your inverter s output into a 50a breaker and your done.
So you always want to be sure your sizing your wire to handle the output of each circuit in the system.
Nec705 12 b 2 3 b states that where there are two power sources the grid and the solar inverter the sum of their breakers cannot equal more than 120 of the busbar rating of the breaker box.
The backfeed generator breaker can t be closed while there is main power on the panel and when there is a power failure it can only be closed after the main breaker is open.
The sizing of back feed breakers is another point of difficulty.
When setting up a generator to backfeed your house power can be pushed out through the main breaker to the transformer and cause unexpected high voltage.
In my case i have 1 6kw solar but 9 6kwh golf battery system it will never get fully charged unless i choose so.
As noted in sec.
If a 200 a busbar has a 200 a main breaker the code allows adding a up to a 40 a backfeed breaker.
We sometimes see people adding a 60 or 80 a breaker instead.
Energizing wiring systems far from your setup like this can damage your equipment and the appliances being powered as well as potential for electrocution to technicians repairing power lines.
Then looking at that photo again you can see i have a 30a 2 pole breaker at the other end for my solar inverter.
690 10 e plug in type back fed circuit breakers connected to a stand alone inverter output in either stand alone or utility interactive systems shall be secured in accordance with 408 36 d.